LOGISTICS & E-COMMERCE
Adhering to the best global practices

With a keen understanding of business needs, we have built facilities that truly supports the manufacturers. Adhering to best global practices, the project is conceptualized and implemented with diligence in every aspect including layout, thoroughfare system, inbound-outbound traffic management, support infrastructure, green cover, and all facets encompassing care, health, and recreation. Moreover, we also have ensured the maintenance & management of the premises and facilities for hassle-free operations and continued world-class experience.

WORLD-CLASS GLOBAL STANDARD PEB WAREHOUSES
40,000 SQ. FT. ONWARDS

Plans & Drawing

STANDARD WAREHOUSE SPECIFICATION

  • Foundation
  • Below ground level on surface having Bearing capacity 20 ton / sqmt
  • Column
  • RCC column up to plinth level.
  • Plinth Height
  • Uniform height of 1.2m (4'-0") from FGL with 0 slopes.
  • Flooring FM2 Floor
  • M25 Grade, 150mm thick, Steel fibre reinforced concrete (SFRC), Dry shake hardener with Liquid Surface Hardener (LSH) - Bekaert Floor Design Flatness - Evaluating provision of FM2 Floor Panels with UDL capacity of 7 tons per sqmt.
  • Walls
  • Concrete block wall 200 mm thick to facilitate insulation to improve indoor air quality. 3.90 m high above plinth with 23 mm external sand faced plaster and 12 mm internal cement plaster and internal wall partitions.
  • Lintel/ Beam
  • As per RCC design.
  • Internal Paint
  • OBD (Ivory Colour)
  • External Paint
  • Waterproof cement paint with cement primer base (Ivory Colour)
  • Openings
  • GI Rolling Shutters - 3.0m width x 3.2m height
  • Dock Leveler Provision
  • Provision of pit for dock leveller of 2.2m x 3.0m at each L/U bay.
  • Loading Platform
  • Continuous platform providing 2.0m of clear space for external marshalling
  • Dock Fenders
  • Dock fenders of high density rubber fitted on anchor bolts for protection of platform edge.
  • Forklift Ramp
  • Ramp of 8 degrees gradient for movement of Stackers and Fork Lifts
  • Human Entry
  • One each at first & last bay
  • Emergency Exit
  • Provision of 7 additional emergency exit doors at side & rear walls
  • Security Gates and Cabins
  • 2 security gates with cabins each at entry and exit points
  • P.E.B.
  • Pre Engineered Building
  • Size
  • 59.0 M X 152.5M
  • Clear Height
  • 8m
  • Mid Height
  • 9.475m
  • No. of Bay's
  • 10 Nos. with no intermediary column
  • Wall Sheet Cladding
  • 0.50mm (TCT) Colour Coated above 3.9m Block wall
  • Roof Sheeting
  • Minimum 0.55 mm TCT Bare Galvalume with Standing seam.
  • Roof Type
  • Screw less - Standing Seam
  • Rainwater Gutters
  • Colour Coated Galvulum gutters with down take pipes fixed with end spouts up to Finished Ground Level.
  • Natural Light
  • Through side Wall cladding 3%-5% (2mm thk Polycarbonate sheets)
  • Ridge Ventilators
  • 0.9 mt wide throat continuous Ridge Ventilators to achieve 6 ACPH
  • Canopy
  • Continuous Canopy of 4.0m overhangs with soffit.
  • Canopy Soffit Sheet
  • Single Skin 0.50mm TCT, pre-painted, with min yield strength of 550n/mm2, confirming to ASTM A-325.
  • Canopy Wall Cladding
  • Single Skin 0.50mm TCT, pre-painted, with min yield strength of 550n/mm2, confirming to ASTM A-325.
  • Canopy Gutters and Down Pipes
  • Gutter system with down pipes embedded within soffit. 100 mm Galvalume profile down spouts to be provided up to the road level, fixed on required saddle, line & level.
  • Safety Ladder
  • 2 Cage Ladders, one on each side of Gable ends are provided to access roof from existing FRL.
  • Lightening Arrestor Fixing Arrangement
  • Provision of fixing the lighting arrestor.
  • Roof Life Line
  • Safety Life Line system provided on roof for maintenance
  • Lightening Arrestor fixing arrangement
  • Provision of fixing the Lighting arrestor.
  • Collateral load
  • Not Considered
  • Building Insulation
  • Aluminium reflective insulation - polynum Super Fire retardant, providing an average of 6 to 7 degrees centigrade difference between ambient and internal.
  • Plumbing/ Sewerage System
  • Up to tapping point only.
  • Electrical
  • All installations in accordance with Industrial Norms for Warehouse with IS specification.Provided for Stacker charging stations and other gadgets at each Bay.Metal halide High Bay lamps, Focus lights at loading bays, Canopy lighting.
  • Lighting
  • Warehouse Internal Lighting - 150 lux, Canopy 100 lux, External 30 lux.
  • Fire Fighting
  • Fire Hydrant with Hose Reels, Fire Egress Exit Doors, Emergency Exit Signs.
  • Exclusive Road
  • 30m exclusive road with loading/Unloading platform with Gate & Security cabin at Entry & Exit
  • Landscaped Area
  • Landscaped area at entry & exit points to enhance aesthetics of the Warehouse.
  • Signage
  • Objective to Identify Structures, Areas, Guide People, Vehicle and Material, Caution and Instructions.
  • Power Supply
  • 63Kva

Download Brochure in PDF Format